Perpetual Calendar

l  Problem

Please make a calendar for a specified year in the future (2020 for example). The output shall be strings in a format of a normal calendar, separated by month and year with the date and week day information included.

 

l  Tip

General steps: Firstly, loop through the 12 months to get and add the titles of the month and the week onto the yearly calendar. Then loop through all days of a specific month, concatenate the dates in a week, separated with the \t. Once the concatenation for one week is done, append the result to the calendar and proceed to the next week.

1.  Define the year and the resulting sequence of the calendar, and calculate the day on which Jan. 1 falls.

2.  Loop through the 12 months, setting the header for each month.

3.  Loop through the days of the current month in a loop and concatenate the strings in a week

4.  After concatenating strings for one week, fill the result onto the calendar and proceed to the next week.

5.  After the loop of one month is finished,append the stings of the remaining days less than one week onto the calendar

 

l  Code

 

A

B

C

D

 

1

1984

=[" Year "+string(A1)]

 

 

Store the resulting perpetual calendar

2

=day@w(date(A1,1,1))

 

 

 

Store the week day of the current day in the loop, the initial value is Jan 1

3

for 12

>B1=B1|["\n","\t\t\t"+string(date(A1,A3,1),"MMMM"),"Sun\tMon\tTue\tWed\tThu\tFri\tSat"]

 

 

Cycle the months and set the header field for each month

4

=fill("\t",A2-1)

 

 

Store the current week string during the process of loop. Regarding the first week of each month, the indentation of the first day must be considered.

5

 

for days(date(A1, A3,1))

 

 

Cycle all day in the current month and concatenate the week to the current week string B4 by day

6

 

 

>A2=A2+1

 

 

7

 

 

>B4=B4+string(B5)

 

 

8

 

 

if A2==8

>A2=1

Return to Monday after cycling through the whole week

9

 

 

 

>B1=B1|B4

Add the week string cycled through to the perpetual calendar

10

 

 

 

>B4=""

 

11

 

 

else

>B4=B4+"\t"

Otherwise, add \t as the separator between days

12

if B4!=""

>B1=B1|B4

 

The last week of each month maybe less than 7 days. These days shall also be filled onto the perpetual calendar.

 

l  Result